PVC water pipe installation precautions

1、Sawing and beveling

Sawing tools should be fine tooth saws, cutters and pipe cutters and other tools, the cut should be flat and perpendicular to the body of the pipe, there should be no deformation at the section. The socket can be filed into 15°-30° bevel with medium plate file, the thickness of the bevel is 1/3-1/2 of the thickness of the pipe wall, the length is generally not less than 3mm, the residue should be removed after the bevel is completed.

dfsf

2、Depth of pipe end socket

Pipe fitting should be inserted once with the pipe fitting, and the mark should be marked on its surface.

3、Adhesive painting

It is recommended to choose PVC special adhesive, with the adhesive distribution of small brushes dipped in adhesive, paint the joint surface of the pipe and pipe fittings, should be axially painted, the action quickly and evenly coated, and brush the right amount of adhesive, do not miss the coating or coating too thick. Winter construction must pay particular attention to the construction of the socket should be coated first after the socket.

4、The connection of the socket interface

After the socket is painted with adhesive, the pipe should be immediately inserted into the socket in the right direction, so that the pipe end insertion depth in line with the drawn mark, and ensure the straightness of the socket interface and the correct position of the interface, should also be maintained for 2-3 minutes to prevent the interface from slipping off, the error between the nodes of the prefabricated pipe end should be no more than 5mm.

5, the socket interface maintenance

After the socket interface is inserted, the extruded adhesive should be wiped clean with cotton or dry cloth dipped in detergent. According to the performance of the adhesive and climate conditions until the interface is cured. Winter or rainy season construction curing time should be extended appropriately.